Monday, November 12, 2012

Basement Week...3

The basement is slowly but surely coming along.  Week three we spent stapling up insulation on the bottom half of the exposed walls (Since the top half was already insulated) and Rod did the electrical work.

Well...  this week was the week of electrical work. And so pretty much we did nothing but wait for Rod to come over and do all the work for us. Thanks Rod.

So this post is short and sweet. Because I don't know what he did or how he did it. But it is done. And this was what we needed to complete so we could start hanging drywall.

So here is where we were at the end of week 3.





No comments:

Post a Comment